注册 登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

paul.mcdean的博客

 
 
 

日志

 
 

Connection between Six-Sigma and CMMI  

2007-05-06 23:41:15|  分类: 管理科学 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |

Connection between the Six Sigma DMAIC roadmap and Capability Maturity Model Integration (CMMI), some practitioners may not be aware of the connections between CMMI and Design for Six Sigma (DFSS). CMMI has four process categories, each contains several process areas that are associated with a maturity level (Table 1). Process areas most strongly connected to DFSS are those in the engineering process category.

Table 1: Breakdown of Four Process Categories of CMMI

Process
Category

Process
Area

Mat.
Level

Process
Mgmt.

Organizational Process Definition
Organizational Process Focus
Organizational Training
Organizational Process Performance
Organizational Innovation/Deployment

3
3
3
4
5

Project
Mgmt.

Project Planning
Project Monitoring and Control
Supplier Agreement Management
Integrated Project Management for IPPD
Risk Management
Integrated Teaming
Integrated supplier Management
Quantitative Project Management

2
2
2
3
3
3
3
4

Engineering

Requirements Management
Requirements Development
Technical Solution
Product Integration
Verification
Validation

2
3
3
3
3
3

Support

Configuration Management
Process and Product Quality Assurance
Measurement and Analysis
Decision Analysis and Resolution
Organizational Environment for Integration
Causal Analysis and Resolution

2
2
2
3

3
5









  评论这张
 
阅读(17)| 评论(0)
推荐 转载

历史上的今天

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2017